Überlegene Performance & Energieeffizienz in einem robusten CarrierGrade Design
CPU | Dual socket support for six-core Intel® Xeon® Processors 5600 Series |
Chipset | Intel® 5520 Chipset + ICH10R |
Dimensions (H x W x D) | 3.45 inches (87.6 mm) x 17.14 inches (435.3 mm) x 20 inches (508 mm) |
Alarm Card | Telco Alarm Management: Telco alarm LEDs on front panel. Relay connector on rear panel supports central office alarm systems |
Drive bays internal | Drive trays for up to six hot-swap 2.5-inch SAS or SATA hard disk drives |
Flash | Multiple flash memory options, including---Internal bootable USB flash device, Two front accessible SD flash media devices, SATA solid state drives |
Front Bezel | Customizable front bezel adaptable to customer needs and environment |
Hot Swap | Hot-swap, redundant fans; hot-swap, redundant power supplies; hot-swap hard drives |
I/O Expansion Type | Optional I/O module enables additional Quad GbE ports or Dual 10GbE ports |
Main Memory | Twelve RDIMM/UDIMM memory slots (DDR3-800/1066/1333). Maximum 96 GB memory |
Management | Intel® Remote Management Module 3 (RMM3) w/ GCM4 (optional) |
PCI Express / PCI support | Supports 3 or 5 PCI-E slots, or 3 PCI-E & 2 PCI-X slots. PCI Gen2 supported. |
Power Supply | Dual-redundant 600W AC or DC hot-swap power supply (2nd power supply optional). PMBus supported. |
RAID | Software RAID 0,1,10 supported (std); Hardware RAID 5,6 supported as optional module |
Rear I/O | Two rear-panel GbE NIC (Cu) ports are standard |
CG2100 Datasheet
[ datasheet_cg2100.pdf, 991.68 KB, Aug.31.2017 ]
CG2100 Installation and Maintenance Guide - Revision 1.2
This manual is for trained system technicians who are responsible for troubleshooting, upgrading, and maintaining this server. This document provides a brief overview of the features of the system followed by a list of accessories or other components you may need or want to purchase, instructions for how to add or replace components in the CG2100 server, and troubleshooting information.
[ cg2100_iandmguide_1_2.pdf, 2.38 MB, Sep.11.2017 ]
Guide to CRMS Rack Mount Kits
This guide provides an overview of rack mounting options that are offered by Kontron for its Communication Rack Mount Servers on 2-post or 4-post, 19-inch or 23-inch racks.
[ crms-rack-mount-kits_1_0.pdf, 403.9 KB, Sep.11.2017 ]
Frequently Asked Questions (FAQ)
High Level and Technical FAQ for CRMS
[ faq.htm, 76 B, Sep.11.2017 ]
SEL Troubleshooting Guide
System Event Log troubleshooting guide
[ s5500_systemeventlog_troubleshootingguid.pdf, 1.39 MB, Sep.11.2017 ]
General Safety Instruction
[ general-safety-instructions.pdf, 628.88 KB, Aug.02.2024 ]
OFU Build 16
One Boot Flash Update Utility zip file
[ ofu_build16.zip, 5.39 MB, Nov.27.2013 ]
Firmware Update Package for the Kontron Deployment Assistant, OFU, and EFI
SUP30: BIOS 64, BMC 61, FRUSDR 13, ME1.12
(IMPORTANT NOTE: Read the release.txt and carefully follow the update instructions for each package. Follow the instructions in the EFI_usage.txt file to update all firmware with one script).
[ stu29_636113.zip, 12.92 MB, Nov.27.2013 ]
BIOS RECOVERY PROCEDURE
These instructions should be followed if the system does not POST due to a corrupt System BIOS image.
Follow the instructions found in the Recovery1.txt file.
[ bios_r0061_rec.zip, 8.83 MB, Nov.27.2013 ]
SAS/SATA Software RAID Firmware and OpROM Update Package Version 1.32.04
Refer to 'README_first.txt' for detailed change log and update instructions.
1. Unzip all of the files from the zip package onto USB key, maintaining the directory structure. Please make sure that the USB key is fully compatible with the EFI version on your motherboard. Some incompatible versions may prevent USB key working normally.
2. Boot to the EFI shell
- Press 'F2' during POSt to enter BIOS Setup
- Select Boot Manager -> EFI Shell
3. Change drive and directory location to where you unzipped the package by typing the following commands:
fs0:
[ crms_sas_firmware_1-32-04.zip, 31.17 MB, Apr.20.2023 ]
Onboard NIC drivers for Linux
[ intel-lan_linux_v16-7.zip, 3.46 MB, Apr.20.2023 ]
Onboard NIC drivers for Windows Server 2008
[ intel-lan_msft_v16-7-whql.zip, 65.9 MB, Apr.20.2023 ]
HWRAID Firmware Flash Update
LSI 1078 HWRAID FW Version 0746. See readme.txt for installation instructions.
[ nsn2u_cg2100_hwraid_firmware_v1-40-92-0746_pkg-v11-0-1-0022.zip, 17.16 MB, Apr.20.2023 ]
Deployment Assistant CD - (Click "open" when prompted for crms.html)
This download link is to the Deployment CD ISO image for the Carrier Grade Server CG2100 and the IP Network Server NSN2U. Use a CD burning utility to extract the contents of the ISO image to CD or DVD Media. The ISO image can also be copied to a USB memory device or SD card. Please see "How do I configure and install my CG2100 without a CD/DVD drive?" on the documentation page of the CD.
[ crms.html, 1.96 KB, Apr.10.2018 ]
"How do I configure and install my CG2100 without a CD/DVD drive?"
Documentation and utilities for the transfer of OS install images and the Kontron Deployment Assistant to a USB stick or SD memory card.
[ iso2usb.zip, 11.44 MB, Nov.27.2013 ]
IPMImisc-1.2.6 rpm package for Linux
The ipmimisc package contains these utilities:
tamutil tamled iboot icmd iresetbmc getsmbios getplatform seltime diskevents immconfig getadvipmi
[ ipmimisc-1-2-6rpms-tar.gz, 4.38 MB, Apr.20.2023 ]
AutoGrab Event Log Collection Utility
1) Download the grab .iso file from the link provided in the autograb.htm file.
2) Follow the instructions to make the USB stick bootable.
3) Boot the server to the USB stick. If boot priority is enabled in the BIOS it should boot to the USB stick. If it doesn't boot to the USB stick then go to the BIOS and set the boot order to boot from your USB device first.
4) A script will automatically run after the system has booted into SLAX Linux and gather the event logs to the /capture directory. Note: Do not remove the USB stick until the system shuts down. It is during these last few seconds that the logs are copied to the USB stick. These logs can be submitted to technical support to help diagnose system issues remotely. The email address for technical support is included in the autograb.txt file.
[ autograb.htm, 1.47 KB, Nov.27.2013 ]
Software Optimization Advances Power Efficiencies in Global Telecom Solutions
Sophisticated telecommunications systems offering higher bandwidth capacities, more intelligent processing architectures and more complex implementations result in greater power demands. And more power means higher operating costs, as well as more complex engineering
to accommodate thermal management. As a result, power efficiency has emerged as one of the key areas for long-term improvement in telecom applications. Reduced energy usage means lower costs and diminished environmental impact; in turn, potential savings for carriers are significant when evaluated against the ‘always on’ central office or
data center.
[ whitepaper_software-optimization-advances-power-efficiencies-in-global-telecom-s, 1.33 MB, Nov.27.2013 ]
Maintaining High Performance and Reliability: Innovative Vibration Suppression Technology for Communication Rack Mount Servers
The Communication Rack Mount Server
(CRMS) division at Kontron has an ongoing practice of
analyzing potential issues that could jeopardize how its
servers adhere to NEBS requirements or the overall quality
and reliability of the system itself. The experts at Kontron
are committed to testing and reviewing all components to
make sure each is up to the company’s high standards. As
part of this continual analysis process, the design team has
revealed some significant concerns associated with system
vibration that needs to be given serious consideration when
choosing a reliable server.
[ 1601_whitepaper-vibrationsupression_en.pdf, 1.11 MB, Nov.26.2020 ]
IPMI and Open Source Tools: Sorting Out the Confusion
Improving Server Management with the Right IPMI Tools for Your Implementation. The aim of server management is to help service systems via controls and information retrieved from sensors so that problems can be diagnosed early, quickly and, before they become overly critical. IPMI (Intelligent Platform Management Interface) is a standard interface used by many vendors to support all of these server management functions, either locally or remotely. IPMI-based management activities take place in the management controller firmware, instead of using the extra bandwidth from the main processor, which would reduce its production capacity. Using IPMI for server management enables the management of any large numbers of servers without spending the extra time and cost of on-site visits, and administrators can manage many different vendors’ systems with the same software, thereby reducing each server’s total cost of ownership.
[ kontron_wp_ipmi.pdf, 1.33 MB, Nov.27.2013 ]
S5520UR Baseboard Technical Product Specification Update - September 2011
[ s5520ur_msu_aug2011.pdf, 608.41 KB, Nov.27.2013 ]
S5520UR Baseboard Technical Product Specification (TPS) Revision 1.9
[ s5520ur_tps_r1_9.pdf, 2.81 MB, Nov.27.2013 ]
CG2100 System Technical Product Specification (TPS) - Revision 1.2
Detailed description of System functionality
[ cg2100_tps_1_2.pdf, 12.41 MB, Oct.17.2023 ]
CRMS WEEE Statement
Kontron’s position on compliance to the WEEE Directive for its Communication Rackmount Servers (CRMS)
[ kontron-crms-weee-statement.pdf, 29.48 KB, Jul.03.2018 ]
Intel Remote Management Module 3 (RMM3) User Guide - Revision 1.1
Intel Remote Management Module 3 (RMM3) User Guide - Revision 1.1
[ intel_rmm3_userguide_1_1.pdf, 5.82 MB, Nov.27.2013 ]
LSI MegaRAID SAS Software User's Guide
[ mr_sas_sw_ug.pdf, 4.87 MB, Nov.27.2013 ]
Tested Memory List (June 2013)
This is a .pdf copy of the tested memory list from Intel's website. Please refer to the S5520UR Server Configurator for the latest version.
[ cg2100_tml_rev1.pdf, 85.56 KB, May.17.2022 ]
Tested Hardware and Operating System List (THOL) Revision 1.8
List of tested hardware and operating systems
[ cg2100_thol_1-8.pdf, 404.81 KB, Apr.20.2023 ]
CG2100 Configuration Guide - Rev. 1.1
Guidance on what to order, and SKU definition
[ cg2100_configguide_1_1.pdf, 1.26 MB, Jan.14.2023 ]
Kontron Services Brochure
[ kontron-services-brochure.pdf, 8.9 MB, Dec.17.2020 ]
Take advantage of our full-service approach
To find out more about our services go to services pages